Arwal Small Hydel Project (1 x 500 KW)

 
line decor
  
line decor

Salient features

 

Sone canal System is one of the oldest canal system in the country. It is in operation since 1874.

The Arwal H.E. Project envisages to utilize the existing fall of 3.20 meter on Patna Branch Canal at 68.4 km. Main canal for generation of Hydro Electric Power.

Location : Block-Arwal, Distt – Arwal

 

1.         Catchment area of Sone river              :           69000 sq km. at the barrage

2.         Water Conductor System

            (a)        Power Channel                        :           165 M,
            (b)        tailrace Channel                       :           180 M,

3.         Power House

            (a)        Installed capacity                     :          1x500 Kw.
            (b)        Design Head                           :           3.20 M
            (c)        Design Discharge                   :           18.12 Cumecs
            (d)        Annual Energy Generation     :           3.35 GWH

4.         Turbine (s)                                           :           Semi Kaplan, Syphon Intake, Vertical Turbine

5.         Generator                                            :           Synchronous Brushless, Electronic Governor vertical Generator

***